Renovation
7 min read

What happens when work stops midway

A builder walking off the job is every owner's worst case. Here is how to recover, and how to avoid it.
Daniel Harper
Senior project manager

Why jobs stall

Most stalled jobs we are called in to finish stopped for the same reasons: the builder ran out of cash, took on too much work, or hit a problem they could not price.

‍

The owner is usually the last to know. Crews stop showing up, calls go unanswered, and the site sits open to the weather.

‍

Protect the site first

Before anything else, the building needs to be closed up against rain and cold. Water damage in an unfinished house spreads fast.

‍

The first things we check
  • Is the building weather-tight?
  • Are the permits still open?
  • What has been inspected?
  • What was paid for, but not done?
  • Which trades are owed money?

Liens can follow the house

Unpaid trades can register liens against your property. Knowing who is owed what matters before a new builder takes over.

‍

Finishing someone else's work

We start with a full review: what was built, what was inspected, and what has to be opened up and checked before we build on top of it.

‍

How to avoid it
  • Pay for work done, not ahead
  • Ask for proof of payment to trades
  • Check the builder's licence
  • Get weekly written updates
  • Keep a holdback until the end

‍

It can be finished

A stalled job is stressful, but it is recoverable. The sooner a new builder reviews it, the less it costs to put right.