Elbow Park residence

Client type
Private client
Duration
14 Months
Service type
Custom homes
Elbow Park residence
Client goal

A family home that shrugs off the next flood

The owners lost their basement in 2013. They wanted a new home on the same lot, with nothing below grade that water could ruin.

‍

At a glance
  • Client goal: Flood-ready family home
  • Move-in date: Before the new school year
  • Site constraint: Narrow lot, mature elms both sides
The challenge

Building deep on a narrow lot beside two old elms

The lot is 33 feet wide with century-old elms on both property lines. A full-depth basement meant shoring right up against their roots, and the neighbours stayed home through the whole build.

‍

We hired an arborist before excavation, hand-dug around the root zones, and moved the mechanical room up to the main floor so nothing expensive sits below the flood line.

How we built it

Flood-ready from the footings up

A waterproofed concrete basement, backflow valves on every drain, and electrical kept above the 2013 high-water mark. Upstairs, the owners picked finishes from one room of samples.

‍

Key milestones
  • Shoring complete / Week 5 / Both elms protected and signed off by the arborist
  • Roof on / Week 22 / Dried in before the first October snow
  • Keys handed over / August 2026 / Family moved in two weeks before school started
Final result

A dry basement, and both trees

The family moved in on schedule. Both elms came through construction healthy, and the basement has already sat through two spring melts without a drop.

‍

By the numbers
  • 3,850 / Square Feet Finished / Three storeys plus a walkout basement
  • 2 Weeks Early / Move-in Date / Settled in before the school year
  • 14 Months / Start to Keys / Including a full Calgary winter on site
Quote Up
Rusnak treated our lot like they had to live next to it afterward. The Friday reports meant we never had to ask where things stood.
Ryan Kowalski
Ryan Kowalski
Homeowner, Elbow Park

Planning a custom home or infill?

If you have a lot, a sketch or just a list of must-haves, we can tell you what it will realistically cost and how long it will take. First conversations cover budget, timing and what your lot will allow.